EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
MattJ
-
Listing for Category : Cabin AIr
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (116)
Research
- (2)
Workshop
- (5)
Empennage
- (5)
Fuselage
- (16)
Firewall
- (4)
Tail Feathers
- (1)
Wings
- (7)
Controls
- (8)
Avionics
- (10)
Lighting
- (2)
Instrument Panel
- (1)
Landing Gear
- (7)
Engine
- (12)
Propeller
- (2)
Fuel System
- (6)
Interior Finish
- (11)
Paint / Decals
- (8)
Inspection
- (3)
Tools
- (2)
Cabin AIr
- (4)
Builder Name:
Matt Jakus
-
Project:
The Airplane Factory - Sling TSi
-
VIEW REPORTS
Total Hours:
1190.7
Start/Last Date:
Dec 01, 2019 - Jan 29, 2023
Engine:
Rotax 915is
Panel:
Garmin 3X
Friendly URL:
https://eaabuilderslog.org?s=MattJ
Home or Last Project Picture
May 09, 2021
Finishing Air system
- (12 hours)
Category: Cabin AIr
Finishing up the air system. I isolated the defrost section of the dashboard by using a foam that will compress and allow some leeway when installing the dash.
The CEET duct has been attached to the new Airmaster panel valves. I will get new plates to cover where the old valve levers were positioned. I am considering running a small heat duct down the center channel to the rear seat area.
First section of foam to isolate the defroster
20210425_121504.jpg
installed
Seats in postion
Plates will come to cover this section
Probably use this lighten hole for a small heat duct from the center channel
I may put a heat vent on either side of the center channel by the rear seat feet
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.